Bashayer Al Khair (A) [Mahmudiya Axis]

  • Bridges
  • Supply, Fabrication & Erection
  • 3000 ton
  • 2019

The steel made bridge consists of two levels. The first level is dedicated to the construction of a commercial mall and the second level for traffic. Bridge is 900 meters long and 24 meters wide. 

The construction of the Bashayer Al-Khair Bridge (A) played a big roll in solving the traffic congestion problem in the Karmouz area where a markets area is present..

View Our

Gallery

View More

Projects